A47 planned closure next month

Northamptonshire Highways are requiring to carry out carriageway retexturing works on the A43/A47 roundabout and section of the A47 between the Duddington roundabout and the Rutland county boundary.  To undertake these works safely will require that the roads are closed overnight from the 27th August until the 2nd September 2019 between 8pm and 6am. 

A plan showing the closure and the diversion can be viewed here https://roadworks.org?tm=114319431

If you require more information about the works please contact Steve Cross (Design) or Jamie Morris/Gavin Hopkins (Construction) on 01604 883400.

Advertisements

About The Admin Team

This website is looked after by a small volunteer team. Please leave a comment or email fifisings@live.com to get in touch.
This entry was posted in Buses, Collyweston, Roads, Travel. Bookmark the permalink.

Please leave a Reply here.

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.